top of page

Kick Detection Simulation

In this simulation, our virtual instructor guides a student through the drilling and kick detection process. All procedures are scored automatically per IADC grading standards for the Driller Level.

Each of our drilling simulations includes access for 1 student for 1 year to go through the simulation as many times as desired. Purchasing gives you access to both the Offline version on your iPad/iPhone and the Web version on your PC/Laptop 

Line up BOP Panel

Correctly line up the BOP for normal drilling operations. 

bop-simulator.PNG

Line up the Choke Panel

Line up the Choke Panel for normal drilling operations

choke-panel-simulator.PNG

Line up the Standpipe Manifold

Line up the Standpipe Manifold for normal drilling operations

manifold-simulator.PNG

Line up the Choke Manifold

Line up the Choke Manifold for normal drilling operations

manifold-simulator2.PNG

Line up the Trip Tank

Line up the Trip Tank for normal drilling operations

trip-tank-simulator.PNG

Check and Set BOP Pressures

Confirm BOP pressures are correct and regulate them correctly.

bop-control-system-simulator.PNG

Set Pit Volume Alarms

Set pit volume alarms for kick detection during normal drilling operations

alarm-simulator.PNG

Set Flow Rate Alarms

Set flow rate alarms for kick detection during normal drilling operations

alarm-simulator2.PNG

Start Drilling and Monitor Data

Begin normal drilling operations, monitor well data, and record it on a drilling recorder.

drilling-recorder-simulator.PNG

Detect Kick Warning Signs & Flow Check

Detect a kick warning sign and then flow check the well.

image1-min.png

Detect Kick Indicators & Shut-In

Shut-In the well after successfully detecting and validating a kick indicator.

image5-min.png

Detect and Handle a BOP closing shut-in problem

Follow IADC guidelines to handle a BOP shut-in problem

shutin-problem-simulator.PNG

Detect and Handle a Choke Leak shut-in problem

Follow IADC guidelines to handle a Choke Leak shut-in problem

image4-min.PNG

Detect and Handle a Pump Leak shut-in problem

Follow IADC guidelines to handle a Pump Leak shut-in problem

image4-min.PNG
bottom of page